DETAILS OF COMPLETED CONTRACTS
Sl No. |
Package |
Name of work |
Length in km |
Contract Value Rs. in crores |
Name of the Contractor |
1. |
EPC01 |
Upgrading Kanchipuram - Vandavasi Road (SH116) km 14/300-km 36/700 |
22.342 |
184.98 |
M/s.KNR Constructions Limited, Hyderabad |
Upgrading Sadras - Chengalpattu - Kancheepuram - Arakkonam - Thiruthani Road (SH58) km 0/000 to km 26/811 |
26.14 |
||||
2. |
EPC02 |
Upgrading Arcot - Villupuram Road (SH4) km 29/000 to km 110/165 and km 113/325 to km 114/600 |
83.075 |
320.02 |
M/s.KNR Constructions Limited, Hyderabad |
3. |
EPC03 |
Upgrading Cuddalore - Chittoor Road(SH-9) Km 41/700 to Km 44/000 and Km 45/000 to Km 66/190 and construction of a new link road between SH-9 and SH-137 (Km 66/190 to Km 71/147) EPC-03 |
28.450 |
95.220 |
M/s.Om Sakthi Constructions |
4. |
EPC05 |
Upgrading Omalur - Sankari - Thiruchengode - Paramathy road (SH86) km 54/800 to km 81/000 |
26.20 |
103.81 |
M/s.P&C Constructions Pvt. Ltd, Erode |
5. |
EPC06 |
Upgrading Malliyakarai - Rasipuram - Trichengode - Erode Road (SH79) km 0/000 to km 30/600 and km 51/400 to km 71/300 |
50.50 |
224.06 |
M/s.KNR Constructions Limited, Hyderabad |
6. |
EPC07 |
Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road (SH95) km 0/000 to km 13/100. |
13.10 |
63.95 |
M/s.P.Ramu, Madurai |
7. |
EPC08 |
Upgrading Nanguneri - Bharatavaram - Ovari Road (SH89) upto ECR junction km 0/000 to km 35/200 |
35.20 |
110.99 |
M/s.Sindhumurugan & Co, Tirunelveli |
8. |
EPC09 |
Upgrading Paruvakudi - Kovilpatti - Ettayapuram -Vilathikulam - Vembar Road (SH44) km 22/500 to km 38/750 and km 41/300 to km 56/700 |
31.65 |
152.97 |
M/s.PKM – SPL (JV), Madurai |
9. |
EPC10 |
Upgrading Rajapalayam - Sankarankoil - Tirunelveli Road (SH41) km 1/800 to km 28/000 and km 33/800 to km 82/800 |
75.20 |
286.50 |
M/s.SPK AND CO. – KMC (JV), Ramnad District |
10. |
PPP 02 |
Four laning of Oddanchatram– Dharapuram–Avinashipalayam section of SH37 from km.37.400 to 108.400 on modified annuity basis (DBFOMT). |
70.2 |
713.45 (Pre-GST Tax structure) |
M/s.RCCL Expressway Private Limited, Erode |
Ongoing Works
Sl No. |
Package |
Name of work |
Length in km |
Contract Value Rs. in crores |
Name of the Contractor |
1 |
EPC 04 |
Upgrading Vridhachalam - Parangipettai Road (SH-70) Km 0/000 to Km 35/800 (Balance Works). EPC-04 |
35.800 |
129.942 |
M/s.Sree Infratech-DRAIPL (JV) |
2 |
EPC 11 |
Four Laning of Omalur to Mecheri Section of SH 222 From Ex.Km 1.150 To Ex.Km 14.300 EPC11 |
13.17 |
144.64 |
OM SAKTHI Constructions Villupuram |
3 |
EPC 12 |
Strengthening and Widening of Malliyakarai – Attur road of SH-30 (Km.81/125 - 91/200) EPC12 |
9.884 |
95.14 |
SPL Infrastructure Private Limited,Chennai |
4 |
EPC 13 |
Four Laning of Chithode to Erode Section of SH 15 from Existing km 153.500 To Existing Km 161.625 (Design Km 153+600 To Design Km 161+725) EPC13 |
8.125 |
104.7 |
OM SAKTHI Constructions Villupuram |
5 |
EPC 14 |
Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road of SH-39 from Km 5+000 to Km 27+700 (package I) EPC14 |
22.7 |
176.58 |
RPP-SMC(JV) Erode |
6 |
EPC 15 |
Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road (SH 39) Km 27+700 to Km 50+600 (package II) EPC15 |
22.9 |
254.13 |
P&C-RPP(JV) Chennai |
7 |
EPC 16 |
Four Laning of Gobi - Erode Section of SH-15 from Km 123+000 to Km 153+600 EPC16 |
30.6 |
272.54 |
P&C-RPP(JV) Erode |
INVITATION FOR BIDS & CLARIFICATION MEETING
Online Payment link for SBI Click here
Contract |
SH No. |
Name of the road stretch |
Length in km |
EPC03 |
SH 9 |
Upgrading Cuddalore - Chittoor Road (SH9) Km 41/700 to Km 44/000 and Km 45/000 to Km 66+190 and construction of a new link road between SH9 and SH137 (Km 66+190 to Km 71+147) |
28.45 |