TAMILNADU ROAD SECTOR PROJECT

new imageTender Notice No. TNRSP II/CCPP/ESIA/2022-23/01, Dated: 14.09.2022 for "Independent Consultant for Preparation of Environmental and Social Management Instruments in Transforming the existing Roads to Smart Urban Roads in Chennai City".
new image" Addendum No.1 and Addendum No.2 to RFP No. TNRSP II/CCPP/ 2022-23/02 for the work of "Preparation of Detailed Project Report and Bid Process Management for Transforming the existing Roads to Smart Urban Roads in Chennai City - Package 02""
new image" Preparation of Detailed Project Report and Bid Process Management for Transforming the existing Roads to Smart Urban Roads in Chennai City- Package 02"
new image"Final Report- End Term Impact Evaluation of Environmental Safeguards Implementation under World Bank Assisted TNRSP-II"
new image"Final Report- Second TNRSP: End Term Impact Evaluation of Land Acquisition and Resettlement Implementation"
new image"Preparation of Detailed Project Report and Bid Process Management for Transforming the existing Roads to Smart Urban Roads in Chennai City"
new image"Audit Certificate for the year 2020-21"
new imageContract Award Information of "Selection of service Provider for Conducting Road Condition survey in State Highways and Major District Roads in the state of Tamil Nadu using ADCE"
new imageContract Award Information for 14 activities of Additional facilities to the training centre and hostel of Highways Department.
new image REOI & ToR of consultancy services for set up and operationalizing a State Road Safety Authority (SRSA), and establishing/revamping State Road Safety Fund (SRSF)
  • Font Plus
  • Font Default
  • Font Minus
Screen Reader Access
smartian image

About

TAMIL NADU ROAD SECTOR PROJECT II

TNRSP–II has been formed for upgrading important road corridors to cater to high density traffic within the State, funded by the World Bank.

The Wing functions under the control of a Project Director. The Project Director is assisted by 1 Chief Engineer, 2 Superintending Engineers and 8 Divisional Engineers. The project involves upgradation and maintenance of high intensity traffic corridors of around 1187 Kms.

Engineering Procurement & Construction (EPC) Contracts:

In this mode of EPC contract, the contractor has to design, construct and maintain the road. Under this contract 427.967 km length of roads have been taken up for widening and upgrading to 2 lanes with paved shoulders in 10 Packages for a value of Rs.1704.91 Cr and the works were completed.


Contract

SH No.

Name of the work

Length in

km

Cost in

cores (Rs)

EPC 01

SH116

Upgrading Kanchipuram –Vandavasi Road Km14/300 to km36/700

22.342

184.98

SH58

Upgrading Sadras - Chengalpattu – Kancheepuram Arakkonam - Thiruthani Road km 0/000 to Km 26/811

26.140

EPC 02

SH4

Upgrading Arcot - Villupuram Road km 29/800 to km110/ 165 and km 113/ 325 to km 114/600

83.075

320.02

EPC 03

SH9

Upgrading Cuddalore – Chittoor Road km 41 /700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH 37 (km 66/190 to km 71/147)

28.450

95.22

EPC 04

SH70

Upgrading Vridhachalam - Parangipettai Road km 0/000 to km 35/800 (Balance Works)

35.800

129.942

EPC 05

SH86

Upgrading Omalur - Sankari - Thiruchengode –Paramathy road km 54/800 to km 81/000

26.200

103.81

EPC 06

SH79

Upgrading Malliyakarai -Rasipuram-Trichengode– Erode Road km 0/000 to

km 30/600 and km 51/400 to km 71/300

50.525

224.06

EPC 07

SH95

Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road km 0/000 to km 13/385

13.385

63.95

EPC 08

SH89

Upgrading Nanguneri - Bharatavaram - Ovari Road upto ECR junction km 0/000 to km 35/200

35.200

110.99

EPC 09

SH44

Upgrading Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road km 22/500 to km 38/750 and km

41/300 to km 56/700

31.650

152.92

EPC 10

SH41

Upgrading Rajapalayam -Sankarankoil-Tirunelveli Road Km.1/800 to km 28/000 and km 33/800 to km 82/800

75.200

286.50


Output and Performance Based Road Contracts (OPRC):

Roads already upgraded in TNRSP phase 1 have been taken up for maintenance under OPRC mode for a period of 5 years. Under this Contract, 2 packages for a total length of 581.493 Km have been taken up for maintenance for a value of Rs.220.07Cr.

Public Private Partnership (PPP Contract):

“Four laning of the Road SH-37 - Oddanchatram – Dharapuram – Avinashipalayam section of SH 37 from Km 37/400 to Km 108+400” for a length of 70.2 Km has been completed under PPP mode and presently it is under 8-year maintenance period.

Ongoing Works – 6 Works

At present the status of six works are given below: -


Package

Name of the Road

Length in Km

Contract Price in Cr

Status

EPC 11

Four Laning of Omalur to Mecheri Section of SH 222 From Ex. Km 1.150 To Ex. Km 14.300

13.170

144.64

Work Completed.

Opened to Public Use by Hon'ble Chief Minister of Tamil Nadu on 11.06.2023.

EPC 12

Strengthening and Widening of Malliyakarai – Attur road of SH-30 (Km.81/125 - 91/200)

9.884

95.14

90.24 % of Work Completed.

Balance Work in Progress.

EPC 13

Four Laning of Chithode to Erode Section of SH 15 from Existing km 153.500 To Existing Km 161.625 (Design Km 153+600 To Design Km 161+725)

8.125

104.70

Work Completed.

EPC 14

Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road of SH-39 from Km 5+000 to Km 27+700 (package I)

22.700

176.58

Work Completed.

EPC 15

Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road (SH 39) Km 27+700 to Km 50+600 (package II)

22.900

254.13

94.95 % of Work Completed.

Balance Work in Progress.

EPC16

Four Laning of Gobi - Erode Section of SH-15 from Km 123+000 to Km 153+600

30.600

272.53

86.36 % of Work Completed.

Balance Work in Progress.

Grand Total

107.379

1047.72


DPR Preparation by using Tamil Nadu Infrastructure Development Board (TNIDB) Fund:

An amount of Rs.132.76 Crore has been sanctioned for Preparation of Detailed Project Reports for a length of 3319 Km roads under TNIDB fund. Out of this 3319 Km, 718.709 Km length of roads have been taken-up in first phase by engaging project preparation consultants in 5 packages.

DPR Preparation for Transforming Chennai City roads into Smart Urban roads

Under Chennai City Partnership-2 (CCP) Programme i.e., Urban Mobility and Spatial Development (UMSD) with the World Bank Loan Assistance, for developing 134.20 km length of eight major roads in Chennai City into smart roads, preparation of Detailed Project Report is under progress at a cost of Rs.15. 94 Crore. The DPR preparation has been awarded to the consultant, M/s. L & T Infrastructure Engg Ltd., Chennai in two packages for a length of 54.50Km & 79.70Km.


Package 01

S.No.

Name of road

Length in km

1

Grand Southern Trunk (GST) Road
Km 0/0 to Km 28/0 (SHU-88)

28.00

2

Grand Western Trunk (GWT) Road
Km 0/0 to Km 9/0 (SHU-86)

9.00

3

Inner Ring Road Km 0/0 to Km 17/5 (SH-2)

17.50

Package 01 Total

54.50


Package 02

S.No.

Name of road

Length in km

1

Grand Northern Trunk (GNT) Road
Km 0/8 to Km 11/5 (SHU-87)

10.70

2

Velachery Bye Pass Road Km 0/0 to Km 1/9 (SH-48C)

1.90

3

Marmalong Bridge Irumbuliyur road
Km 5/0 to km 21/2 (SH-48)

16.20

4

Mount Poonamallee Avadi (MPA) Road
Km 0/0 to Km 20/8 (SH-55)

20.20

5

ECR from Akkarai to Mahabalipuram
Km 22/3 - Km 53/0

30.70

Package 02 Total

79.70

Totallength in Km (Package 01 + Package 02)

134.20

For Chief Engineer (H),

TNRSP II, Chennai – 28.