TAMIL NADU ROAD SECTOR PROJECT II
TNRSP–II has been formed for upgrading important road corridors to cater to high density traffic within the State, funded by the World Bank.
The Wing functions under the control of a Project Director. The Project Director is assisted by 1 Chief Engineer, 2 Superintending Engineers and 8 Divisional Engineers. The project involves upgradation and maintenance of high intensity traffic corridors of around 1187 Kms.
Engineering Procurement & Construction (EPC) Contracts:
In this mode of EPC contract, the contractor has to design, construct and maintain the road. Under this contract 427.967 km length of roads have been taken up for widening and upgrading to 2 lanes with paved shoulders in 10 Packages for a value of Rs.1704.91 Cr and the works were completed.
Contract |
SH No. |
Name of the work |
Length in km
|
Cost in cores (Rs) |
EPC 01 |
SH116 |
Upgrading Kanchipuram –Vandavasi Road Km14/300 to km36/700 |
22.342 |
184.98 |
SH58 |
Upgrading Sadras - Chengalpattu – Kancheepuram Arakkonam - Thiruthani Road km 0/000 to Km 26/811 |
26.140 |
||
EPC 02 |
SH4 |
Upgrading Arcot - Villupuram Road km 29/800 to km110/ 165 and km 113/ 325 to km 114/600 |
83.075 |
320.02 |
EPC 03 |
SH9 |
Upgrading Cuddalore – Chittoor Road km 41 /700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH 37 (km 66/190 to km 71/147) |
28.450 |
95.22 |
EPC 04 |
SH70 |
Upgrading Vridhachalam - Parangipettai Road km 0/000 to km 35/800 (Balance Works) |
35.800 |
129.942 |
EPC 05 |
SH86 |
Upgrading Omalur - Sankari - Thiruchengode –Paramathy road km 54/800 to km 81/000 |
26.200 |
103.81 |
EPC 06 |
SH79 |
Upgrading Malliyakarai -Rasipuram-Trichengode– Erode Road km 0/000 to km 30/600 and km 51/400 to km 71/300 |
50.525 |
224.06 |
EPC 07 |
SH95 |
Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road km 0/000 to km 13/385 |
13.385 |
63.95 |
EPC 08 |
SH89 |
Upgrading Nanguneri - Bharatavaram - Ovari Road upto ECR junction km 0/000 to km 35/200 |
35.200 |
110.99 |
EPC 09 |
SH44 |
Upgrading Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road km 22/500 to km 38/750 and km 41/300 to km 56/700 |
31.650 |
152.92 |
EPC 10 |
SH41 |
Upgrading Rajapalayam -Sankarankoil-Tirunelveli Road Km.1/800 to km 28/000 and km 33/800 to km 82/800 |
75.200 |
286.50 |
Output and Performance Based Road Contracts (OPRC):
Roads already upgraded in TNRSP phase 1 have been taken up for maintenance under OPRC mode for a period of 5 years. Under this Contract, 2 packages for a total length of 581.493 Km have been taken up for maintenance for a value of Rs.220.07Cr.
Public Private Partnership (PPP Contract):
“Four laning of the Road SH-37 - Oddanchatram – Dharapuram – Avinashipalayam section of SH 37 from Km 37/400 to Km 108+400” for a length of 70.2 Km has been completed under PPP mode and presently it is under 8-year maintenance period.
Ongoing Works – 6 Works
At present the status of six works are given below: -
Package |
Name of the Road |
Length in Km |
Contract Price in Cr |
Status |
EPC 11 |
Four Laning of Omalur to Mecheri Section of SH 222 From Ex. Km 1.150 To Ex. Km 14.300 |
13.170 |
144.64 |
Work Completed. Opened to Public Use by Hon'ble Chief Minister of Tamil Nadu on 11.06.2023. |
EPC 12 |
Strengthening and Widening of Malliyakarai – Attur road of SH-30 (Km.81/125 - 91/200) |
9.884 |
95.14 |
90.24 % of Work Completed. Balance Work in Progress. |
EPC 13 |
Four Laning of Chithode to Erode Section of SH 15 from Existing km 153.500 To Existing Km 161.625 (Design Km 153+600 To Design Km 161+725) |
8.125 |
104.70 |
Work Completed. |
EPC 14 |
Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road of SH-39 from Km 5+000 to Km 27+700 (package I) |
22.700 |
176.58 |
Work Completed. |
EPC 15 |
Strengthening and Widening (Four Lane) of Tirunelveli – Sengottai – Kollam Road (SH 39) Km 27+700 to Km 50+600 (package II) |
22.900 |
254.13 |
94.95 % of Work Completed. Balance Work in Progress. |
EPC16 |
Four Laning of Gobi - Erode Section of SH-15 from Km 123+000 to Km 153+600 |
30.600 |
272.53 |
86.36 % of Work Completed. Balance Work in Progress. |
Grand Total |
107.379 |
1047.72 |
DPR Preparation by using Tamil Nadu Infrastructure Development Board (TNIDB) Fund:
An amount of Rs.132.76 Crore has been sanctioned for Preparation of Detailed Project Reports for a length of 3319 Km roads under TNIDB fund. Out of this 3319 Km, 718.709 Km length of roads have been taken-up in first phase by engaging project preparation consultants in 5 packages.
DPR Preparation for Transforming Chennai City roads into Smart Urban roads
Under Chennai City Partnership-2 (CCP) Programme i.e., Urban Mobility and Spatial Development (UMSD) with the World Bank Loan Assistance, for developing 134.20 km length of eight major roads in Chennai City into smart roads, preparation of Detailed Project Report is under progress at a cost of Rs.15. 94 Crore. The DPR preparation has been awarded to the consultant, M/s. L & T Infrastructure Engg Ltd., Chennai in two packages for a length of 54.50Km & 79.70Km.
Package 01 |
||
S.No. |
Name of road |
Length in km |
1 |
Grand Southern Trunk (GST) Road |
28.00 |
2 |
Grand Western Trunk (GWT) Road |
9.00 |
3 |
Inner Ring Road Km 0/0 to Km 17/5 (SH-2) |
17.50 |
Package 01 Total |
54.50 |
Package 02 |
||
S.No. |
Name of road |
Length in km |
1 |
Grand Northern Trunk (GNT) Road |
10.70 |
2 |
Velachery Bye Pass Road Km 0/0 to Km 1/9 (SH-48C) |
1.90 |
3 |
Marmalong Bridge Irumbuliyur road |
16.20 |
4 |
Mount Poonamallee Avadi (MPA) Road |
20.20 |
5 |
ECR from Akkarai to Mahabalipuram |
30.70 |
Package 02 Total |
79.70 |
|
Totallength in Km (Package 01 + Package 02) |
134.20 |
For Chief Engineer (H),
TNRSP II, Chennai – 28.